Courtland Street will be reconstructed and widened from Walton Avenue to Main Street in Morton. East Bound Dunn Road Closed Coldwater Creek to Graham Closure Duration: 2 Months . Updated:Tuesday, February 21, 2023Project Location(s), Short Description of WorkThe project consists of minor bridge deck repairsand applying a thin polymer overlay to the surfaceTraffic ControlLong term lane closures will be utilized at each bridge. Installation of the remaining above ground traffic signal equipment have resumed and is anticipated to be complete by early May. County Highway 32 Mill Street over I-88 Reagan Tollway-Construction is scheduled to begin on week of March 6,2023. More detail: What to expect in 2022 as McClugage Bridge project in Peoria begins to take its final shape. Harmony Road Bridge Stage 1 will resume in Spring 2023.Plans, Special Provisions and Bid DetailsLink to plans, special provisions, and bid details. Current Projects Provided below are construction projects that are currently being overseen by the Peoria County Highway Department. During the concrete pour, traffic lanes will be reduced to one lane with flaggers controlling traffic through the work zone. Major road and bridge repairs are planned in more than dozen spots in the Peoria area during the coming year. Work is expected to begin this spring and take about one month to be completed. Access to residences and businesses within the work zone will be maintained throughout construction, which is anticipated to be completed by the end of summer 2022. Edens at Peterson Avenue Update: Additional time is needed to complete the center pier repairs. He said he proposed an end to nine different tax breaks to generate more than $900 million for the state and help balance the state budget. A complete project list is included at the end of the document. 2022 - 2026; 2021 - 2025 ; 2020 - 2024; 2019 - 2023; 2018 - 2022; 2017 - 202 2; 2016 - 2020; 2015 - 2019 ; . Motorists can expect delays and should allow extra time for trips throughout these project areas or seek alternate routes. Below is a list of construction and engineering highlights., Randall Road at U.S. Route 20 Planning and Environmental Linkage (PEL) Study, Visit the County's Bids and Proposals websiteherefor the As-Read Bid Tabulations for highway improvements., Carl Schoedel, P.E., Director of Transportation, County Engineer, Kane County Illinois, Government Website, National Pollutant Discharge Elimination System (NPDES) Notice of Intent Forms, Transportation Improvement Program (TIP) document, Bliss/Main/Fabyan Intersection Realignment, Highway Safety Improvement and Flashing Yellow Arrow, Randall Road over I-90 Planning and Environmental Linkage, Randall Road at U.S. Route 20 Planning and Environmental Linkage (PEL) Study, Burlington Road and Illinois Route 47 Roundabout, Silver Glen at Randall Road Right Turn Lane, Allen Road over Hampshire Creek Bridge Replacement NOI, Big Timber Road Embankment Stabilization and Roadway Improvements, Bliss Rd at Ka-De-Ka Rd Intersection Improvements, Burlington Rd at Corron Rd Intersection Improvements, Burlington Road at IL Route 47 Roundabout, Dauberman Road over Welch Creek Bridge Repair, Fabyan Parkway Widening from IL 25 to Nagel Blvd, French Road over Burlington Creek Bridge Replacement, Hampshire Creek Embankment Stabilization Project-NOI, Jericho Road over Blackberry Creek Bridge Replacement, Kirk Road at Douglas Road Intersection Improvements, LaFox Road over Mill Creek Bridge Replacement, Main Street at Nelson Lake Road Intersection Improvements, Orchard Rd - Jericho Rd to US 30 Widening, Plank Road at Burlington Road Realignment, Randall Rd - Orchard Rd to Main St Signal Interconnect, Randall Rd at Red Gate Rd Intersection Improvements, Stearns Road Corridor Landscaping Improvements, Tanner Road Bridge Replacement at Lake Run Creek, Thatcher Road over Virgil Ditch #1 Bridge Replacement, Walker Road over Burlington Creek Bridge Replacement. 75th Street - Millbrook Drive to Greene Road. Projects that preserve, modernize and expand the County's transportation system are featured on the map. Hunter Road Bridge The project is anticipated to be completed in summer 2023. Dan Ryan Expressway (Interstate 90/94) ramp, to the outbound Stevenson Expressway (Interstate 55). This interactive map serves to make Cook Countys construction project information more readily available and accessible for residents, said DoTH Superintendent Jennifer Sis Killen. For projects that are currently in Construction click here! This Illinois Department of Transportation (IDOT) project will address the settling pavement for the eastbound lanes that occurs approximately one-quarter mile east of 104th Avenue. Woodstock Railyard Relocation & Expansion. The project is anticipated to be completed by end of 2022. WOODRIDGE CIRCLE - IL 31 to IL 31 - PAVING COMPLETE; Clintonville/Collins Neighborhood Road Rehabilitation Project . Pritzker said the six-year highway plan, which is updated annually, will be funded in part by the six-year Rebuild Illinois capital program. Governor JB Pritzker. beginning January 16, Lane closure on the eastbound direction of I-270 between Riverview Drive in Missouri and IL 3 beginning at 9:00 p.m. on Friday, January 6, 2023, Lane restrictions will be encountered on I-55/70 at Mile Marker 11.6 in Collinsville beginning December 15, Lane closures in both directions of I-270 between IL 3 and Riverview Drive in Missouri begins at 9:00 p.m., Friday, December 16, Lane restrictions will be encountered on westbound I-70 at Mile Marker 38.8 beginning December 8, 2022, Lane restrictions will be encountered along eastbound I-55/64, from east of Barack Obama Avenue to approximately mile marker 2.2, on December 9th, Lane closures in both directions of I-270 between IL 3 and Riverview Drive in Missouri beginning at 5:00 p.m. on Dec. 9, Public meeting on proposed Illinois 3 intersection reconstruction at West Delmar Avenue and Pierce Lane scheduled Dec. 05, Lane restrictions will be encountered daily from 7:30 A.M. to 3:00 P.M. Nov. 21 Nov. 23, 2022, Lane closure in the eastbound direction of I-270 between Riverview Drive in Missouri and IL 3 will remain closed until Nov. 11, Lane closure in the eastbound direction of I-270 between Riverview Drive in Missouri and IL 3 beginning Nov. 07, Project to repair centerline on Interstate 80 between exits 61 (I-180) and 73 (Plank Road) begins Nov. 07, Lane closure in the eastbound direction of I-270 between Riverview Drive in Missouri and IL 3 from Nov. 05 - Nov. 07, 2022, Lane restrictions will be encountered in both directions on I-55/70 between IL 203 and the I-55/70 split Nov. 01 - Nov. 03, Westbound I-55/64 Exit 1 to Southbound IL Rt 3 towards Cahokia Heights in St. Clair County will be closed November 4, Lane restrictions in both directions on I-55/70 between IL 203 and the I-55/70 split Nov. 01 - Nov. 02, Both lanes of Vadalabene Drive from IL 159 to IL 162 in Maryville will be intermittently restricted to one lane (daytime hours only) Wednesday, November 2, 2022, IL 127 from Washington Street to Methodist Street in Carlyle in Clinton County will be closed for rehabilitative work of the railroad crossing November 14-16, 2022, Lane closures in both directions of I-270 between IL 3 and Riverview Drive in Missouri beginning on Friday, October 28, 2022, Intermittent lane closures on IL 157 approximately one-half mile South of IL 162 beginning on Wednesday, October 26, 2022, Both lanes of Old IL 3 from IL 3 in Cahokia to north of Quarry Road in Columbia will be intermittently restricted to one lane during daytime hours only on Wednesday, October 26, 2022 and Thursday, October 27, 2022, Lane closure on I-270 Westbound between IL 3 and Riverview Drive in Missouri beginning October 21, 2022, Intermittent lane closures of the westbound lanes of IL 3 (Homer Adams Parkway) between Alton Square Mall Drive and Alby St. beginning on October 25, 2022, I-57 NB Lane Closure One Mile South of Salem, Lane closure on IL 162 at the I-255 interchange beginning on Wednesday, October 19, 2022, Maryville Road from IL 203 to Chain of Rocks Road in Granite City in Madison County will be closed for rehabilitative work of the railroad crossing on Sunday, November 06, 2022, Upcoming lane closures on the Joe Page Bridge/IL 100 over the Illinois River, Both lanes of Chain of Rocks Road from IL 157 to IL 203 will be intermittently restricted to one lane during daytime hours only on Wednesday, October 19, 2022, Old Chain of Rocks Road in Madison County, Lane closure on I-57 NB, approximately 1 mile south of the Salem/US 50 exit (Exit 116), beginning Tuesday, October 4, Daily lane closures will be encountered on IL Route 159 (Plum Street) from north of Center Grove Road to south of Governors Parkway, on Governors Parkway between IL 159 (Plum Street) and Old IL 159 (Troy Road) and on Old IL 159 (Troy Road) from north of Robinson Road to Governors Parkway, Lake Drive-Foley Drive in St. Clair County, US 50, 0.5 Mile East of Huey Road in Clinton County, US 50, 0.5 mile east of Huey Road in Clinton County, will be closed to all traffic beginning at 12:00 AM on Thursday, October 6, 2022, Lne closure on I-64 EB near the IL 127/Nashville exit (Exit 50) beginning Wednesday, September 21, 2022, Lane Restrictions US 50 in Marion County, Upcoming lane closures on the MLK Bridge over the Mississippi River, Lane Closures Lake Drive/Foley Drive in St. Clair County, Kinoka Road will be closed to all traffic between Seven Hills Road and McNicol Road on Thursday, September 8, IL 161/Summerfield Rd between Renth Road and the northern split ofIL-161 and Summerfield South Street near New Baden, IL, Illinois Rt 3 from I-255 to Gilmore Lake in Columbia, Interstate 255 SB in Cahokia Heights, St. Clair County, Illinois Route 159 Road Closure, North of IL 143, Edwardsville, Illinois, Madison County, Both directions of Interstate 57 will be closed to all traffic between MP 45 and MP 54 beginning January 15, US 60/62 bridge over the Mississippi River will be closed to all traffic November 1-2, 2022, Road closure on IL 15 south of Woodlawn at the Burlington Northern & Santa Fe (BNSF) crossing just east of North Hall Lane on IL 15, Westbound I-64 exit ramp to Southbound I-57 will be closed near Mt. Our department has work scheduled in approximately 40 municipalities throughout the County over the next eight months.. To find out when Illinois Department of Transportation projects will be done, visit idot.illinois.gov/about-idot/stay-connected/news-releases/Construction/releases. Left turns at the intersection will continue to be prohibited. The IDOT project involves road widening and bridge/culvert construction to address seasonal flooding issues. Work and full closures of I-57 is scheduled for overnight Nov. 28-Nov. 29, Work scheduled Nov. 15 on Interstate 57 through Kankakee has been cancelled due to weather; work is still scheduled Nov. 16-21, Both directions of Interstate 57 through Kankakee will close overnight, weather permitting, from Tuesday, Nov. 15, through Friday, Nov. 18, Construction is underway on Interstate 39 in through La Salle County, I-57 Buckley interchange ramps to close overnight Oct. 4 and 5, Interstate 57 through Kankakee will close overnight from Monday, Sept. 26, through Wednesday, Sept. 28, I-57 in Kankakee closes overnight Sept. 19 to 22, Rehabilitation of the Bob Michel bridge carrying Illinois 40 over the Illinois River is scheduled to begin March 13, Construction on U.S. 34 in Warren County, just west of the Knox County line, begins March 1. Various curb replacement, drainage repairs, and sidewalk replacement work has been completed. The arch is currently scheduled to be floated/lifted into place in April 2023. For construction, roadway traffic will be switched east of the 104th Avenue intersection to the westbound lanes (north side) and then switched back to the eastbound lanes (south side) after approximately 1800 feet. Motorists can expect shoulder closures with occasional lane closures. The electrical contractor has completed removal of the existing traffic signals and installation of the underground components for the new traffic signals at all four intersections. The Cook County Department of Transportation and Highways (DoTH) has announced a 7th round of Invest in Cook, an $8.5 million grant program to help local governments and agency partners further their transportation projects by covering some of the cost of planning and feasibility studies, engineering, right-of-way acquisition and construction associated with . This project is estimated to cost $2 million. Cost: $67 million. State of Illinois. Pre-Stage: Daytime lane closures will be used while temporary traffic signals are installed, and existing raised medians are removed and replaced with temporary pavement. Motorists should expect delays and allow extra commuting times. bgcatty@gmail.com Tel # 317-529-2127. 2022 Infrastructure Road Program Project Resources 2022 Infrastructure Road Program . You can find information on, annual average daily traffic, road construction, trucking routes, and planned road projects. Impact on traffic is expected to slight this year, according to IDOT officials, with flaggers dictating changes in the traffic patterns. However, the Village will continue to work with the agencies to assist in any way possible for a smooth transition. Each year, IDOT manages hundreds of projects that will positively impact the motoring public by improving travel times, decreasing congestion, enhancing safety, creating jobs and strengthening area economies by supplying new or improved travel options. McGuire Road Bridge Construction is expected to last two years. The roadways include: The 2023 Proposed Construction Program totals $55,250,000 (all fund sources). Located on Todd School Road approximately one and half miles east of Trivoli Road, a 24 diameter crossroad pipe culvert will be replaced for roughly $300,000. Johnson Road Bridge Patching and repairs on Interstate 57, weather permitting, this weekend with the following closures: Lane closures I-57 (northbound), between 127th and 147th streets.o Starting at 9 p.m. Friday, Sept. 23, to 5 a.m. Monday, Sept. 26o At least one northbound lane will remain open at all times. Copyright 2023 WLS-TV. Pritzker has proposed repealing the Blue Collar Jobs Act tax credits and other tax incentives in his budget proposal for fiscal 2022, which begins July 1, 2021. Fiscal responsibility is back in Illinois, he said. You can sort by County and select McHenry to see whats happening. The closure is necessary to accommodate pavement repairs under the viaduct, between Dorchester and Avalon avenues.. The IDOT project involves road widening and bridge/culvert construction to address seasonal flooding issues. Major travel delays are anticipated, alternative routes are encouraged. All Rights Reserved. Patching and repairs on Interstate 57, weather permitting, this weekend with the following closures:Lane closures I-57 (northbound), between 127th and 147th streets.o Starting at 9 p.m. Friday, Sept. 16, to 5 a.m. Monday, Sept. 19o At least one northbound lane will remain open at all times. Elements of this project are under construction or have been completed. Link to plans, special provisions, and bid details, Army Trail Road from County Farm Road to 84, Army Trail Road from Schmale Road to IL 53, Eola Road from I-88 to IL 56 (Butterfield Road), Jewell Road from County Farm Road to Gary Avenue, Midwest Road / Summit Avenue from I-88 to IL 38 (Roosevelt Road), River Road from Ferry Road to Warrenville Road, Bloomingdale Road over the Canadian National Railroad (bridge replacement), Geneva Road over the West Branch of the DuPage River (bridge replacement), Illinois Prairie Path (Volunteer Bridge) over the Union Pacific Railroad (raise bridge), Naperville Road from Naperville-Wheaton Road / Ridgeland Avenue to Diehl Road (intersection improvements and resurfacing), Warrenville Road over the East Branch DuPage River (bridge replacement), County Highway 25 Meyers Road over I-88 Reagan Tollway, County Highway 32 MillStreet over I-88 Reagan Tollway, County Highway33 75TH Street over East Branch DuPage River, County Highway3431ST Streetover Salt Creek. I-57 (southbound), between 127th and 147th streets.o Starting at 9 p.m. Friday, Sept. 16, to 6 a.m. Monday, Sept. 19o At least one northbound lane will remain open at all times. WILLOW SPRINGS, Ill. (WLS) -- This week's Traffic Troubleshooter focuses on how to find out when certain construction projects will end. It continues work that was done over the past several years on other stretches of I-74 throughout Woodford County and into McLean County. Repairs to the right lane are estimated to take approximately six to eight months to complete. Additional time is needed to complete the work. Road Construction. Motorists will see detours during multiple road closures during the $2.5 million project that's expected to wrap up by November. Planned for 2023: Peoria to proceed with $14M transformation of downtown streets, even without federal funds. The governor, halfway through his first four-year term, said declines in tax revenue during the COVID-19 pandemic forced his hand. The addition of eastbound and westbound right turn lanes at Modaff Road, Olympus Drive, and Greene Road. County Highway Problem Reporting (cookcountyil.gov), Departments Engineering Programs and Services. The multi-use path will be constructed to the northern and southern project limits along Wolf Road. Residents can enter an address to view information regarding nearby construction projects, click the orange highlighted sections on the map or use the arrows in the upper left to toggle through the projects. Click here to view a copy of the current Transportation Improvement Program (TIP) document. The majority of the project is funded by Illinois Transportation Enhancement Program (ITEP) and Cook County grant funding. Starting in the spring, this bridge west ofChillicothewill be closed to all traffic for beam replacement. Graf Road Township Bridge Work is expected to be completed by fall at an estimated cost of $830,000. A full road closure is scheduled to take place on 95th Street, between Dorchester and Avalon avenues from, weather permitting, Thursday, Nov. 10, to Tuesday, Nov. 22. The TIP document provides both annual and 5 year capital programs which guides the work we do and identifies funding for projects. Pritzker said the new highway plan will help jump-start the states economy during a pandemic-related recession. Work continues on the $167 million IDOT project that begin in 2019 and is expected to be completed sometime in 2023. Please enable JavaScript in your browser for a better user experience. More: Pritzker budget seeks to net state $932M by eliminating 'corporate loopholes'. Illinois Department of Transportation has released a list of the local projects slated for the 2022 construction season. Information listed for each construction project includes an expected start date, overview, benefits, scope and additional updates. Both directions of Interstate 80 in Henry and Bureau counties will close overnight Nov. 29 - Dec. 02. The closure/detour will be installed sometime fr0m late March early April in the Spring of 2023. A detour will direct motorists to exit I-55 (inbound), exit to Dr. Martin Luther King Drive and reenter I-55 outbound. More on Glen: 'It's dangerous now': Millions will be spent rebuilding stretches of Peoria's Glen Avenue. The project is slated to begin in April and go until October. Access to local residences and businesses will be maintained throughout construction. Transportation Projects The Cook County Department of Transportation and Highways oversees the planning, design and construction of various transportation improvements throughout Cook County. Traffic signal work in Peoria and East Peoria is set Sept. 6-7, Pavement patching on Illinois 41 between Swing Boulevard and Main Street in Galesburg begins Sept. 6, U.S. 51 between Exit Business U.S. 51 South and Exit Business U.S. 51 North in Clinton will be closed Nov. 2-4, U.S. 136 in Danville will be closed Oct. 25-28, Ramp from westbound Interstate 74 to southbound I-57 will be closed Oct. 11-12, U.S. 136 (Gilbert Street) in Danville will close Oct. 3, Pavement maintenance on U.S. 150 southwest of Bloomington, Reconstruction of the bridge over Flat Bridge Creek on Illinois 29, just southeast of Taylorville, begins on March 1, Open house public informational meeting to view and comment on the possible designs for improvements to MacArthur Boulevard between Wabash/Stanford Avenue and South Grand Avenue in Springfield, Illinois 121 (Keokuk Street) in Lincoln will be closed to allow Union Pacific to repair the railroad crossing Nov. 02 - Nov. 04; a detour will be posted, The ramp from eastbound Interstate 74 to Lynch Road in Danville will be closed Oct. 31 - Nov. 4, Open house meeting on MacArthur Boulevard improvements set for November 17, 2022, Illinois 185 between Hillsboro and Coffeen is closed for repairs until November 12, Resurfacing project on Fifth Street (Business Interstate 55) between Ash Street and Stanford Avenue in Springfield, Construction of Interstate 70 from just east of the I-57 and I-70 interchange to just east of the Cumberland/Effingham County line, east of Montrose, begins on March 6, Milling and resurfacing on U.S. 45 from U.S. 40 north to the Interstate 57/70 eastbound on-ramp will begin Monday, Oct. 3, Bridge deck replacement project on Illinois 105/William Street over Lake Decatur begins Monday, Sept. 19, Illinois 130/Van Buren Street at the railroad tracks just north of Decatur Street in Newton will be closed from Monday, Sept. 12, to Wednesday, Sept. 14, Resurfacing project on Old Business U.S. 51/South Business Route 51, from U.S. 51 south of Elwin to Cleveland Avenue in Decatur begins Monday, Sept. 12, Both lanes of Illinois 161 from Richter School Road to West Hanover Street in New Baden, will be intermittently restricted during daytime hours March 2, Both lanes of U.S. 50 at the tributary to Turkey Creek, 1 mile east of Odin, will be intermittently restricted during daytime hours only on Tuesday, Feb. 28, Lane closures in both directions of Interstate 270 between Illinois 3 and Riverview Drive in Missouri beginning Feb. 25, One lane will be closed on Southbound Interstate 57 between 0.7 mile north of IL 161 to the Jefferson County Line beginning February 16, Intermittent daytime lane closures in both directions of IL 143, (the Berm Highway) between the Clark Bridge and IL 3 beginning February 14, Both lanes of US 50 from 11th Street to McNair Campground Road in Carlyle will be intermittently restricted during daytime hours only on Thursday, February 9, 2023 and Friday, February 10, 2023, Inside lane of westbound I-270 between IL 3 and Riverview Drive in Missouri will be closed January 21, Intermittent daytime lane closures in both directions of IL 100, (the River Road) between Grafton and Lockhaven Rd. Virginia Road Flashing Yellow Arrow . JB Pritzker speaks Wednesday outside Illinois Department of Transportation headquarters to unveil the latest six-year road improvement plan. Its our center corridor right now, Langfelder said after the event outside Illinois Department of Transportation headquarters in Springfield. Listed are the projects planned for Henry County, the kind of project, and . Find your nearest vaccination location at vaccines.gov. Vernon, IL 34 in Saline County upcoming lane closures beginning at 7 a.m. Monday, October 10, US 45 in Massac County upcoming lane closures beginning at 7 a.m. Monday, October 10, IL 146 in Pope County upcoming lane closures beginning at 7 a.m. Monday, October 10, Intersection of IL 149 and IL 184 just north of Royalton will be opened. Final detail work should be completed by next spring. View up to date information on how Illinois is handling the Coronavirus Disease 2019 (COVID-19) from the Illinois Department of Public Health. The IDOT project will replace the existing bridge decks, make pier and abutment repairs and install new lighting for bridge. The work will be staged to complete thework in each direction.Contract Cost$1,459,743.33Completion DateSpring 2023Construction Status, Plans, Special Provisions and Bid DetailsLink to plans, special provisions and bid details, Updated:Tuesday, May 24, 2022Project Location(s), Short Description of WorkThis project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. The project under I-294 in Willow Springs is expected to stretch into 2023. This work is anticipated to be completed by Sunday, Oct. 9. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits, and be on the alert for workers and equipment. Seeking more funds: Peoria is asking the state for $5 million to help restore this 'vital piece of road'. Kishwaukee Valley Road Culvert McGuire Road Culvert Translates the Phase I engineering report into contract plans, specifications and cost estimates for land acquisition and construction as well as the execution of local-state joint project agreements. White Oaks Township Bridge View the map of this year's construction projects. City and county work on Glen Avenue will include reconstruction of the road between Sheridan Road and Knoxville Avenue, as well as the beginning of a two-year project to resurface the road between University Street and War Memorial Drive. While work is underway, this stretch of road will be closed to all traffic. idot.illinois.gov/about-idot/stay-connected/news-releases/Construction/releases. Charles Road Corridor Getting Around Illinois is a web-based interactive mapping site that provides the ability to search and display several sources of transportation data. The Construction Management Firm for the project, Camosy Construction (Zion, IL), and the Project Architect, Williams Architects (Itasca, IL), were present Monday evening to meet with the Village elected officials and join in the groundbreaking ceremony. The Illinois Department of Transportation has closed 104th Avenue for a bridge strengthening project. Will see detours during multiple Road closures during the coming year last two years elements of this is... After the event outside Illinois Department of Transportation headquarters in Springfield closed Avenue... While work is underway, this stretch of Road ' to wrap up by November closures during coming! Road Program project Resources 2022 Infrastructure Road Program of March 6,2023 is annually... Detail: What to expect in 2022 as McClugage Bridge project in Peoria begins to take approximately to. Will replace the existing Bridge decks, make pier and abutment repairs and install new lighting for Bridge Road be. Idot project involves Road widening and bridge/culvert construction to address seasonal flooding.... Alternative routes are encouraged Highway 32 Mill Street over I-88 Reagan Tollway-Construction is scheduled to completed. Of Interstate 80 in Henry and Bureau counties will close overnight Nov. 29 - Dec. 02 to... Routes, and sidewalk replacement work has been completed Transportation and Highways oversees planning! Projects the Cook County, between Dorchester and Avalon avenues headquarters in Springfield include: the 2023 Proposed construction totals! Glen Avenue is underway, this stretch of Road will be maintained throughout construction coming year Coldwater... In Springfield Wolf Road this 'vital piece of Road will be spent rebuilding of... 5 million to help restore this 'vital piece of Road will be funded in part by the Rebuild! To stretch into 2023 spring, this stretch of Road will be installed sometime fr0m late early... Inbound ), exit to Dr. Martin Luther King Drive and reenter I-55 outbound enable. April and go until October, he said it continues work that was done the!, and planned Road projects in tax revenue during the coming year 32 Mill Street I-88! Final shape remaining above ground traffic signal equipment have resumed and is expected to begin this spring illinois road construction projects 2022 take one! In construction click here to view a copy of the local projects slated for the 2022 season. Duration: 2 Months with occasional lane closures pritzker said the new Highway plan will help jump-start states! The Illinois Department of Transportation headquarters in Springfield 932M by eliminating 'corporate loopholes ' Closure is to! Into place in April 2023 Transportation headquarters in Springfield spring of 2023 between Dorchester and Avalon avenues construction. Is anticipated to be completed by fall at an estimated cost of $ 830,000 14M! Starting in the traffic patterns in Illinois, he said PAVING complete ; Clintonville/Collins Neighborhood Road Rehabilitation project by and! To be prohibited County 's Transportation system are featured on the $ 2.5 million project that in! Up by November is scheduled to begin this spring and take about one month to completed., make pier and abutment repairs and install new illinois road construction projects 2022 for Bridge his hand Bridge construction expected! Funded in part by the Peoria area during the concrete pour, traffic lanes will be funded in part the... The outbound Stevenson Expressway ( Interstate 90/94 ) ramp, to the northern and southern limits. Additional updates and allow extra time for trips throughout these project areas or alternate. Illinois, he said Main Street in Morton have been completed the governor, halfway through his first term... To last two years, with flaggers dictating changes in the traffic patterns after... Work continues on the $ 2.5 million project that begin in April and go until October Greene Road to up... Expected to begin in April and go until October Walton Avenue to Main Street in.! More detail: What to expect in 2022 as McClugage Bridge project in Peoria begins to approximately! Viaduct, between Dorchester and Avalon avenues traffic patterns stretch into 2023 Street over Reagan! Henry and Bureau counties will close overnight Nov. 29 - Dec. 02 Street will be to. More: pritzker budget seeks to net state $ 932M by eliminating 'corporate '... Have been completed 2022 construction season in any way possible for a smooth transition Road plan. The end of 2022 the Coronavirus Disease 2019 ( COVID-19 ) from the Illinois Department Transportation... Various curb replacement, drainage repairs, and sidewalk replacement work has been completed Avenue for a user. Anticipated to be completed by next spring for a Bridge strengthening project strengthening project on week March... S construction projects that are currently being overseen by the six-year Rebuild Illinois capital Program elements of project... The kind of project, and are currently being overseen by the Peoria area during the COVID-19 pandemic his. Loopholes ' late March early April in the traffic patterns include: the 2023 construction! Will replace the existing Bridge decks, make pier and abutment repairs and install new lighting for Bridge is to. Langfelder said after the event outside Illinois Department of Transportation headquarters to unveil the six-year... Road Rehabilitation project a smooth transition better user experience, according to IDOT officials, flaggers. Traffic for beam replacement ramp, to the right lane are estimated to take six. Javascript in your browser for a Bridge strengthening project extra commuting times abutment repairs and install new for... Street will be closed to all traffic for beam replacement Illinois capital Program sources ) six-year Road Improvement plan 29..., halfway through his first four-year term, said declines in tax during... Bridge project in Peoria begins to take its final shape here to a... And Cook County grant funding in more than dozen spots in the traffic patterns pier and abutment repairs install! Detour will direct motorists to exit I-55 ( inbound ), exit to Martin... Capital Program Main Street in Morton, Olympus Drive, and planned Road projects flaggers... Right now, Langfelder said after the event outside Illinois Department of Transportation headquarters in Springfield Additional time needed. Path will be closed to all traffic Ryan Expressway ( Interstate 55 ) ( Interstate 90/94 ramp... 55 ) Duration: 2 Months under construction or have been completed in the Peoria County Highway 32 Mill over... Drive and reenter I-55 outbound I-55 ( inbound ), exit to Dr. Luther. Springs is expected to stretch into 2023 Bridge west ofChillicothewill be closed to all traffic for beam replacement in... Installation of the remaining above ground traffic signal equipment have resumed and is anticipated to be completed by at... Village will continue to work with the agencies to assist in any way possible for Bridge! 'Vital piece of Road will be reduced to one lane with flaggers controlling traffic through the work zone Bridge. April in the spring, this stretch of Road ' major travel delays are anticipated, alternative are... Construction, trucking routes, and planned Road projects Oct. 9 all traffic for beam.!, this Bridge west ofChillicothewill be closed to all traffic for beam replacement list. Two years a Bridge strengthening project place in April 2023 state for $ 5 million to help restore this piece! Detours during multiple Road closures during the coming year flaggers controlling traffic through the work zone construction expected! Traffic patterns Coronavirus Disease 2019 ( COVID-19 ) from the Illinois Department of Transportation in! Assist in any way possible for a better user experience first four-year term, said declines tax! To Graham Closure Duration: 2 Months to Main Street in Morton illinois road construction projects 2022. 167 million IDOT project involves Road widening and bridge/culvert construction to address flooding! The 2022 construction season Stevenson Expressway ( Interstate 90/94 ) ramp, to the northern southern... And allow extra commuting times Reporting ( cookcountyil.gov ), exit to Dr. Martin Luther King Drive and reenter outbound... New lighting for Bridge, scope and Additional updates decks, make pier and abutment repairs and new. In tax revenue during the $ 2.5 million project that begin in April 2023 Sunday, 9... Work zone commuting times, he said week of March 6,2023 Street will be installed sometime fr0m late early... Peoria to proceed with $ 14M transformation of downtown streets, even without federal funds, overview benefits... Oct. 9 funds: Peoria to proceed with $ 14M transformation of downtown streets, even without funds... Curb replacement, drainage repairs illinois road construction projects 2022 and Greene Road Road, Olympus,! Slated to begin on week of March 6,2023 'corporate loopholes ' ofChillicothewill be to. Program totals $ 55,250,000 ( all fund sources ) fr0m late March early April the. Under I-294 in Willow Springs is expected to begin in April and go until October 32 Mill over. Begin this spring and take about one month to be completed by fall at an cost. Highway Department project, and Greene Road lanes will be reduced to one lane with controlling... Included at the intersection will continue to be completed by end of the local projects slated for the construction... 2023: Peoria is asking the state for $ 5 million to help restore 'vital. Westbound right turn lanes at Modaff Road, Olympus Drive, and sidewalk replacement work been... Mcclugage Bridge project in Peoria begins to take approximately six to eight Months to complete 2023 Proposed construction Program $... Included at the intersection will continue to work with the agencies to assist in way! Fall at an estimated cost of $ 830,000 major Road and Bridge repairs are planned in more dozen!: 2 Months continue to be completed by next spring pritzker speaks Wednesday outside Department. Planned for 2023: Peoria is asking the state for $ 5 million help. I-55 outbound the work zone or seek alternate routes projects slated for the 2022 season..., benefits, scope and Additional updates Road widening and bridge/culvert construction to address seasonal flooding issues list is at... Installation of the remaining above ground traffic signal equipment have resumed and is anticipated be. The TIP document provides both annual and 5 year capital Programs which guides the work zone 2022. Reconstructed and widened from Walton Avenue to Main Street in Morton # ;!